top of page

BW Bomb Well (Instrument Carrier) Assembly

BW Bomb Well (Instrument Carrier) Assembly is designed to protect the instruments from being damaged. The spring in the Bomb Well gives the instrument (Suspended) added protection from jarring and impact during wireline operation.

When ordering it is important to know the OD and the length of the Instrument.


Product Code: 113

TOOL APPLICATION

Applications

  • Protecting pressure and temperature recording instruments from mechanical damage during deployment and retrieval in restricted, debris-laden, or rough wellbore environments

  • Any BHP survey operation where instrument protection is a priority, particularly for expensive or fragile recording instruments

  • Used in conjunction with the JO Unlatching Tool and J Head system for latch-and-leave instrument deployment


Key Benefits

  • Internal spring suspension isolates the instrument from jarring and impact shock loads during wireline operations.

  • The outer housing protects the instrument from contact with the tubing wall, debris, and damage from restrictions.

  • Custom-sized to the OD and length of the specific instrument being deployed for optimized fit and protection

  • Compatible with the JO Unlatching Tool system for jar-free latch-and-leave deployment on top of Collar Stops and Slip Stops

Disclaimer: Information is provided for reference only. Rebco Oil Tools, Inc. makes no express or implied warranty as to the accuracy or completeness of this information. Equipment selection, configuration, and use must be performed by qualified personnel and are subject to approved procedures, well conditions, mechanical limitations, and Rebco’s Terms and Conditions of Sale.

TECHNICAL DATA

RELATED TOOLS

bottom of page